Aliso Viejo prices
Pricing tile work in Aliso Viejo
Very few roofs need new tile. A great many need new underlayment under perfectly good tile.
Or call (949) 667-6205Your request is in.
We are matching it now against roofing contractors working in Aliso Viejo and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
These are estimated ranges, not quotes. Compiled from public installed-cost data for California and adjusted for how Aliso Viejo is built. No contractor is bound by them, and nobody can price a roof they have not stood on.
| Covering | Per square | Typical whole roof | Expected life |
|---|---|---|---|
| Architectural asphalt shingleThe default choice on most American homes, and usually the right one. | $675 – $1,000 | $12,000 – $31,000 | 25 to 30 years |
| Concrete tileThe tile lasts far longer than the underlayment beneath it, which is the catch. | $1,300 – $2,200 | $23,500 – $68,000 | 40 to 60 years |
| Clay barrel tileOften salvaged and re-laid over new underlayment rather than replaced. | $1,700 – $3,300 | $30,500 – $102,500 | 50 to 80 years |
What moves the price
- Whether the fasteners and flashing are specified for coastal exposure
- Permit and inspection fees, which vary more between towns than people expect
- The number of penetrations: chimneys, skylights, vents, solar mounts
- How much decking turns out to be soft once the covering is stripped
- Whether the valleys, drip edge and step flashing are being replaced or reused
Locally
Salt carries further inland than people assume. It shows up first as rust tracks on the vents and staining below the valley metal.
Ask specifically whether the quote is for new tile or for relaying the existing tile. The difference is enormous and easy to miss.
These are estimates, not quotes. They are compiled from national installed ranges adjusted for California costs and for how Aliso Viejo is built. No contractor is bound by them.
Questions about price
Why does ventilation keep coming up?
Because a badly ventilated attic cooks the roof from underneath and takes years off it. Intake at the eaves and exhaust at the ridge, in balance. It is cheap during a re-roof and awkward afterwards.
Are gutters included in a re-roof?
Normally a separate line. It is the one add-on that genuinely costs less when done at the same time.
How many contractors will contact me?
No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.
Get the roof looked at
Three questions, about a minute, and up to three Aliso Viejo contractors come back to you.