Aliso Viejo, CA
Roof replacement in Aliso Viejo
A re-roof is the second-largest cheque most homeowners write on their house, and the one they have the least information about.
Or call (949) 667-6205Describe the replacement job
Three questions, then the address. Up to three Aliso Viejo contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Aliso Viejo and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.
- Which underlayment, and whether ice-and-water goes on the eaves and valleys
- Ventilation: what is there now, what it should be
- How the site is protected, and who cleans up the nails
- Who pulls the permit, and what the inspection schedule looks like
- A written per-sheet price for replacing bad decking
Warranties come in two halves that get deliberately confused. The manufacturer covers the material, and only if it was installed to specification. The contractor covers the workmanship, and only for as long as they stay in business.
The covering is the part you can see and the part everybody quotes on. The parts that decide whether the roof lasts are underlayment, ventilation, drip edge and how the valleys are handled.
Insist on knowing what happens to decking that turns out to be rotten. The good answer is a per-sheet price agreed in writing before the job starts.
Locally
Then, less dramatically: shaded slopes that never really dry out. Slopes that never get direct sun stay wet for hours after the fog burns off, and that is where moss, lifted shingles and soft decking start.
About replacement here
What should I do to prepare?
Move the cars out, take pictures off the top-floor walls, cover anything stored in the attic, and put pets somewhere else for the loud days. Expect nails in the driveway however careful the crew is — ask whether they run a magnet at the end.
Should I take the cheapest quote?
Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
What if the decking is rotten underneath?
Expect a few sheets on most older roofs. Get the per-sheet rate in the contract. Open-ended decking charges are where a fixed price stops being fixed.
Get the roof looked at
Three questions, about a minute, and up to three Aliso Viejo contractors come back to you.
